seguin-ore-crushing

Project Spotlight

Project Scope

Provide crushing services in the Kirkland Lake area to reduce ore size from 24″ minus to 6″ and haul the product to a gold mill.

Challenges

Build access road to old ore stockpiles the clients wanted to process at the mill to determine ore content.

Methodology

  • Because we’re also road builders, we were capable of being a “one stop shop” for our clients
  • We’ve reconstructed the road so it would be suitable to transport our portable crushing spread and handle the ore trucks hauling out of the crushing location
  • Mobilized our spread to site set up and crushed the ore down to 150mm minus
  • Provided loading and hauling services to mill